Vehicle Summary

Mile
Miles

MPG FUEL ECONOMY
CITY
HWY
AVG

Horsepower
HP
Torque
Vehicle Description
BLUETOOTH/HANDS FREE CELL PHONE, BACK UP CAMERA, VERY RARE!!!. 2025 BMW M4 CS AWD 8-Speed Automatic Sport 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 543hp Black Sapphire MetallicRecent Arrival!Flemington BMW has once again been awarded with the 2024 DealerRater Consumer Satisfaction Award in the UNITED STATES! The Consumer Satisfaction Award represents the fact that Flemington BMW is one of the top 10% of U.S. Franchise dealers based on our DealerRater PowerScoreTM. Flemington BMW is also the highest-rated BMW dealership in the state of New Jersey! We are both proud of and humbled by this recognition, says General Manager Byron Brisby, Jr. Congratulations to our staff on this incredible achievement. We owe our success to their hard work and dedication, as well as their commitment to our customers and their satisfaction. We are honored to represent the BMW brand, and look forward to working hard for many years to come. Flemington BMW is also a 6-time recipient of the BMW Center of Excellence Award, and is committed to maintaining that standard of excellence in everything we do. Our Flemington BMW team is constantly working hard to make sure that our customers have an unparalleled BMW buying experience - stop in and see us today!
Welcome To
Flemington BMW
Trusted BMW Dealership in Flemington, NJ
Flemington BMW provides you with the finest vehicles. Our BMW dealership serves Flemington, Clinton, Lambertville, and Hopewell, NJ
Exceptional and luxurious vehicles are available for you at Flemington BMW, a BMW dealership that serves customers from Flemington, Clinton, Lambertville, and Hopewell, NJ. We have a variety of different coupes, sedans, convertibles, hatchbacks, sport activity vehicles and station wagons for you in our new inventory.
There are many great vehicles from BMW and several different manufacturers for you in our pre-owned selection. On site we also have a great finance team, OEM BMW parts, and an amazing service center. When you visit our showroom at 216 US Highway 202 in Flemington, NJ, you're going to see exactly why people have been visiting us to have their automotive needs taken care of for years.
Contact Us
Vehicle Features
-
Interior
- Heated driver and front passenger seats
- Merino leather front seat upholstery
- Driver seat power reclining, seatback side bolster support, cushion tilt, fore/aft control and height adjustable control
- Dual-zone front climate control
- Voice-activated climate control
- Merino leather rear seat upholstery
- Automatic climate control
- Alcantara simulated suede steering wheel
- Manual tilting steering wheel
- Manual telescopic steering wheel
- Leather upholstered dashboard
- Cabin air filter
- Rear under seat climate control ducts
- Rear console climate control ducts
- Bucket front seats
- Driver seat with 10-way directional controls
- M Sport sport front bucket seats
- Front seat center armrest
- Power driver side rear seat easy entry
- Front passenger seat with 10-way directional controls
- M Sportsteering wheel
- Rear bench seat
- Fold forward rear seatback
- 40-20-40 folding rear seats
- Rear seat center armrest
-
Exterior
- Carbon fiber roof panel
- 19 x 9.5-inch front and 20 x 10.5-inch rear bronze forged aluminum wheels
- P275/35YR19 summer performance BSW front tires and P285/30YR20 summer performance BSW rear tires
- Rear lip spoiler
- 2 doors
- Front license plate bracket
- Galvanized steel/aluminum/composite body panels with side impact beams
- Body-colored front bumper
- Body-colored rear bumper
- Rocker panel extensions
- Black grille
- Black side window trim
- Body-colored door handles
- Monotone paint
- Standard style side mirrors
- Carbon fiber door mirrors
- Carbon fiber front and rear bumper inserts
- Black rear bumper rub strip
- Black windshield trim
-
Mechanical
- Part and full-time AWD
- 3L I-6 gasoline direct injection, DOHC, variable valve control, twin turbo, premium unleaded, engine with 543HP
- Dynamic Damper Control automatic suspension ride control with driver control
- Adaptive M Suspension adaptive ride suspension
- M Sport Suspension sport ride suspension
- Driver selectable steering effort
- Auto stop-start engine
- Twin turbo
- 8-speed automatic
- Drivelogic selectable mode transmission
- Transmission electronic control
- STEPTRONIC Sequential shift with steering wheel controls
- Automatic
- M xDrive all-wheel drive
- Red painted front and rear brake calipers
- Cross drilled/slotted front and rear disc brakes
- M Servotronic speed sensitive power steering
- Lock-up transmission
- Brake Energy Regeneration regenerative alternator
- Front mounted engine
- Spark ignition system
- Variable intake manifold
- Longitudinal mounted engine
- Aluminum engine block
- Aluminum cylinder head
-
Safety
- Frontal Collision Warning forward collision mitigation
- City Collision Mitigation pedestrian impact prevention
- Rear mounted camera
- Lane Keeping Assistant/Lane Departure Warning
- Active Blind Spot Detection
- Head-up display
- Brake assist system
- Rear Collision Prevention
- Fatigue and Focus Alert driver attention alert
- Speed Limit Info traffic sign recognition
- Automatic brake hold
- Gage cluster display size: 12.30
- Adaptive LED Headlights directionally adaptive headlights
- High Beam Assistant auto high-beam headlights
- Immobilizer
- Vehicle tracker
- Configurable instrumentation gauges
- DSC electronic stability control system
- Hill start assist
- Park Distance Control front and rear parking sensors
- LED daytime running lights
- Auto-leveling headlights
- Front cornering lights
- LED brake lights
- Rain detecting wipers
-
Entertainment
- Primary monitor touchscreen
- Bluetooth wireless audio streaming
- Harman/kardon speakers
- External memory control
- ConnectedDrive Services internet radio capability
- Performance data recorder
- Voice activated audio controls
- AM/FM/digital/SiriusXM with 360Lsatellite
- 2 total number of 1st row displays
- 14.9 inch primary display
- 600W amplifier
- Logic 7 Surround Sound digital signal processor
- Speed sensitive volume
- 16 speakers
- Seek scan
- Radio data system (RDS)
- 12 month satellite trial subscription
- Integrated roof audio antenna
-
Factory Warranty
-
Basic warranty
48 month/50,000 miles
Powertrain warranty
48 month/50,000 miles
Maintenance warranty
36 month/36,000 miles
-
-
Disclaimers
-
*Prices include all costs to be paid by a consumer except for licensing costs, registration fees and taxes. Please contact dealer to verify price, options, and other vehicle details.
*For all vehicles showing an Internet Price, you must finance or lease through BMW Financial Services May not represent actual vehicle. (Options, colors, trim and body style may vary)
*Number of views in last 30 days
Based on 2025 EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary depending on how you drive and maintain your vehicle.
All advertised vehicles are subject to actual dealer availability. Certain vehicles listed may not be available, or may have different prices. Prices exclude state tax, license, document preparation fee, smog fee, and finance charges, if applicable. Vehicle option and pricing are subject to change. Prices include all dealer incentives. Pricing and availability varies by dealership. Please check with your dealer for more information. Prices do not include dealer charges, such as advertising, that can vary by manufacturer or region, or costs for selling, preparing, displaying or financing the vehicle. Images displayed may not be representative of the actual trim level of a vehicle. Colors shown are the most accurate representations available. However, due to the limitations of web and monitor color display, we cannot guarantee that the colors depicted will exactly match the color of the car. Information provided is believed accurate but all specifications, pricing, and availability must be confirmed in writing (directly) with the dealer to be binding. Neither the Dealer nor the website provider is responsible for any inaccuracies contained herein and by using this application you the customer acknowledge the foregoing and accept such terms.
-