Vehicle Summary
-
Black Sapphire Metallic
-
Fiona Red/Black
-
VIN WBS33HK05TCV71348
-
Stock # WM26021
-
Condition New
-
Exterior Black Sapphire Metallic
-
Interior Fiona Red/Black
-
Engine 3.0L 6-Cylinder TwinPower Turbo
-
Fuel Type Gasoline
-
Drivetrain AWD
-
Location Flemington BMW

Mile
Miles

MPG FUEL ECONOMY
CITY
HWY
AVG

Horsepower
HP
Torque
Welcome To
Flemington BMW
Trusted BMW Dealership in Flemington, NJ
Flemington BMW provides you with the finest vehicles. Our BMW dealership serves Flemington, Clinton, Lambertville, and Hopewell, NJ
Exceptional and luxurious vehicles are available for you at Flemington BMW, a BMW dealership that serves customers from Flemington, Clinton, Lambertville, and Hopewell, NJ. We have a variety of different coupes, sedans, convertibles, hatchbacks, sport activity vehicles and station wagons for you in our new inventory.
There are many great vehicles from BMW and several different manufacturers for you in our pre-owned selection. On site we also have a great finance team, OEM BMW parts, and an amazing service center. When you visit our showroom at 216 US Highway 202 in Flemington, NJ, you're going to see exactly why people have been visiting us to have their automotive needs taken care of for years.
Contact Us
Vehicle Features
-
Interior
- Heated steering wheel
- Heated driver and front passenger seats
- Merino leather front seat upholstery
- Driver seat power reclining, lumbar support, seatback side bolster support, cushion tilt, fore/aft control and height adjustable control
- Dual-zone front climate control
- Voice-activated climate control
- Merino leather rear seat upholstery
- Automatic climate control
- Leather steering wheel
- Manual tilting steering wheel
- Manual telescopic steering wheel
- Cabin air filter
- Rear under seat climate control ducts
- Rear console climate control ducts
- Bucket front seats
- Driver seat with 12-way directional controls
- M Sport sport front bucket seats
- Front seat center armrest
- Power driver side rear seat easy entry
- Front passenger seat with 12-way directional controls
- Driver seat with 4-way power lumbar
- Front passenger seat with 4-way power lumbar
- M Sportsteering wheel
- Rear bench seat
- Fold forward rear seatback
-
Exterior
- Carbon fiber roof panel
- P275/35YR19 summer performance BSW front tires and P285/30YR20 summer performance BSW rear tires
- Rear lip spoiler
- 2 doors
- Front license plate bracket
- Galvanized steel/aluminum/composite body panels with side impact beams
- Body-colored front bumper
- Body-colored rear bumper
- Rocker panel extensions
- Black grille
- Black side window trim
- Body-colored door handles
- Monotone paint
- Standard style side mirrors
- Black rear bumper rub strip
- Black windshield trim
-
Mechanical
- Part and full-time AWD
- 3L I-6 gasoline direct injection, DOHC, Double VANOS variable valve control, TwinPower twin turbo, premium unleaded, engine with 523HP
- Dynamic Damper Control automatic suspension ride control with driver control
- Adaptive M Suspension adaptive ride suspension
- M Sport Suspension sport ride suspension
- Driver selectable steering effort
- Auto stop-start engine
- TwinPower twin turbo
- 8-speed automatic
- Drivelogic selectable mode transmission
- Transmission electronic control
- STEPTRONIC Sequential shift with steering wheel controls
- Automatic
- M xDrive all-wheel drive
- Cross drilled/slotted front and rear disc brakes
- M Servotronic speed sensitive power steering
- Lock-up transmission
- Brake Energy Regeneration regenerative alternator
- Front mounted engine
- Spark ignition system
- Variable intake manifold
- Longitudinal mounted engine
- Aluminum engine block
- Aluminum cylinder head
- Overdrive transmission
-
Safety
- Frontal Collision Warning forward collision mitigation
- City Collision Mitigation pedestrian impact prevention
- Rear mounted camera
- Lane Keeping Assistant/Lane Departure Warning
- Active Blind Spot Detection
- Brake assist system
- Rear Collision Prevention
- Active Protection driver attention alert
- Speed Limit Info traffic sign recognition
- Automatic brake hold
- Gauge cluster display size: 12.30
- Adaptive LED Headlights directionally adaptive headlights
- High Beam Assistant auto high-beam headlights
- Immobilizer
- Vehicle tracker
- Configurable instrumentation gauges
- DSC electronic stability control system
- Hill start assist
- LED daytime running lights
- Auto-leveling headlights
- Front cornering lights
- LED brake lights
- Rain detecting wipers
- Active Protection automatic post-collision braking system
- 8 airbags
-
Entertainment
- Primary monitor touchscreen
- Bluetooth wireless audio streaming
- Harman/kardon speakers
- External memory control
- ConnectedDrive Services internet radio capability
- Voice activated audio controls
- AM/FM/digital/SiriusXM with 360Lsatellite
- 2 total number of 1st row displays
- 14.9 inch primary display
- 600W amplifier
- Logic 7 Surround Sound digital signal processor
- Speed sensitive volume
- 16 speakers
- Seek scan
- Radio data system (RDS)
- 12 month satellite trial subscription
- Integrated roof audio antenna
-
Factory Warranty
-
Basic warranty
48 month/50,000 miles
Powertrain warranty
48 month/50,000 miles
Maintenance warranty
36 month/36,000 miles
-
-
Disclaimers
-
*Prices include all costs to be paid by a consumer except for licensing costs, registration fees and taxes. Please contact dealer to verify price, options, and other vehicle details.
*For all vehicles showing an Internet Price, you must finance or lease through BMW Financial Services May not represent actual vehicle. (Options, colors, trim and body style may vary)
*All Prices are Plus Doc Fee Charge of $654
*Number of views in last 30 days Based on 2026 EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary depending on how you drive and maintain your vehicle.
All advertised vehicles are subject to actual dealer availability. Certain vehicles listed may not be available, or may have different prices. *All calculated payments are subject to credit approval and include tax, tag, title, and applicable fees. Advertised price excludes tax, tag, registration, title, processing fee and dealer installed accessories. Vehicle option and pricing are subject to change. Prices include all dealer incentives. Pricing and availability varies by dealership. Please check with your dealer for more information. Prices do not include dealer charges, such as advertising, that can vary by manufacturer or region, or costs for selling, preparing, displaying or financing the vehicle. Images displayed may not be representative of the actual trim level of a vehicle. Colors shown are the most accurate representations available. However, due to the limitations of web and monitor color display, we cannot guarantee that the colors depicted will exactly match the color of the car. Information provided is believed accurate but all specifications, pricing, and availability must be confirmed in writing (directly) with the dealer to be binding. Neither the Dealer nor the website provider is responsible for any inaccuracies contained herein and by using this application you the customer acknowledge the foregoing and accept such terms.
-